
TDOT To Work On I-24 This Weekend
TDOT contract crews will make concrete repairs this weekend on I-24 West from mile marker 178.9 to mile marker 178.7 in lane #1 (left/fast lane). The work will begin at 8:00 p.m. this Friday and end by or before 6:00 a.m. EST. During the work, lane #1 will be closed. Lane #2 and the Williams Street on-ramp to I-24 West will remain open to traffic.
This work will consist of sawing and removing damaged concrete slabs and re-pouring them with new concrete, which will need several hours to harden enough to handle traffic. As soon as the concrete hardens enough to pass strength tests, all lanes will be reopened to traffic.
While this work takes place, the Tennessee Highway Patrol and a truck-mounted attenuator with a message board will be on site to assist with traffic control and information. Drivers are urged to obey the signage and pay close attention to changing conditions in the work zone.
This concrete repair work is being done as part of a statewide on-call concrete repair contract. This work is weather dependent. Should weather or unforeseen circumstances postpone this work, it will be rescheduled to take place as soon as possible.